How to Use It
1
Pick a budget version
Everything you see is scoped to the selected version (its forecast window, assumptions, and derived GL). See Core Concepts for what a version is.
2
Choose your view
Switch between budget, actuals, forecast, and variance. Actuals and forecast stitch together at the boundary month so you read one continuous picture.
3
Pivot and group
Reshape the table by any dimension (department, account, entity, channel) or by period. Group-by and pivot controls work the same way they do across the platform.
4
Drill into a number
Click any cell to open its underlying transactions, with filter, sort, and export. The underlying rows union actuals and plan, with a Type pill showing where each row came from.
5
Export
Export any view to Excel. Numeric columns export as typed numbers with format masks, so totals still sum and currency negatives render in parentheses.
What the Columns Mean
Where the Numbers Come From
Budget Overview reads the general ledger. Your Headcount, Revenue, and Expense plans all derive into the GL automatically, tagged by source so you can always trace a line back. That is why a P&L built here reflects the latest plan the moment you re-run a forecast, with no separate consolidation step.Common Questions
Why does the Budget column show zero for a row that has actuals?
Why does the Budget column show zero for a row that has actuals?
The row exists in actuals but was never budgeted (a vendor or account that appeared mid-year). Add a plan line in the relevant planning module, or an allocation in Budget Rules, and re-run the forecast so it shows up as budget.
Can I see the people or contracts behind a cost?
Can I see the people or contracts behind a cost?
Yes. Drill any cell to the underlying rows. Headcount-derived cells trace to employees and open positions; revenue-derived cells trace to events and contracts; expense-derived cells trace to plan lines.
Why is variance colored orange or red on some rows and blue on others?
Why is variance colored orange or red on some rows and blue on others?
Variance uses cost-direction coloring. Spending over budget reads warm (orange or red), coming in under budget reads cool (blue), so over-runs stand out without reading every number.
How do I compare two versions, not just plan vs actual?
How do I compare two versions, not just plan vs actual?
Use the Comparison Center to put any two versions or a scenario against the base, line by line.
If the Numbers Look Off
- A roll-up total does not match the rows beneath it: confirm you are not mixing a native-currency column into a base-currency sum, and that the period range is the same on both.
- Recently changed a plan but the P&L did not move: the GL is derived on forecast run. Re-run the forecast for that universe so the derive bridge re-posts.
- A locked version shows stale figures: that is by design. Locked versions are served from a frozen snapshot so historical comparisons never drift.